Ajira Portal:- Requests the submission of Expressions of Interest at Tembo Nickel March, 2024

[ad_1]

1 TEMBO-

2024-02-26

Underground Contract Mining;

a. Supply and install Contractor facilities and services.

b. Supply and install workshops, offices, accommodation, stores and supporting services for the contractor conduct their services.

c. Carry out mechanized underground mining including, but not limited to:

i.           Development with Jumbo drills

ii.           Ground support installation (shotcrete, steel mesh, rock bolts and cable bolts)

iii.           Production drilling

iv.           Load and Hauling

v.           Remote bogging

vi.          CAF/Pastefill servicing, maintenance and management

vii.            Maintenance of full fleet

viii.            Technical Services to support contractor(Engineering etc)

ix.          Escapeway installation and maintenance

x.           Dewatering

xi.          Procure and install UG services (air/water piping, pumps, refuge chambers etc).

d.  Maintain waste rock dumps.

e.  Deliver ore to the ROM pad

f.  Support Tembo Nickel in achieving their Mining Physicals

Commercial

i.       Company profile and up to date organogram

ii.      Company code of business conduct

iii.    Current or previous East African experience, preferably Tanzania.

iv.    Must be compliant with the Local Content Legislation and have an approved Local Content Plan; or provide proof of submission

v.      Supplier’s audited financial statements for the past three consecutive years

vi.    Copy of company memorandum and article of association

Technical

vii.   List and attach all Underground (and surface ancillary)equipment including: development drills, production drills, trucks, development and production boggers, remote boggers, tele-remote equipment, graders, concrete agitator trucks, integrated tool carriers, spray machines and explosive charging machines.

viii.  Demonstrate experience in completing mechanized mining: Jumbo development, longhole stoping, pastefill, load and haul, ground support installation and remote production bogging in the last 5 years. Provide detail of all contracts completed in the last 5 years including value, duration, mining physicals planned/achieved, mining method, equipment and personnel numbers, references and associated contact details.

ix.     Provide details of current contracts in execution.

[ad_2]

Leave a Reply

Your email address will not be published. Required fields are marked *