[ad_1]
CPP Job Vacancies – 4 Various Positions
Total Exploration and Development Uganda Limited (TEPU), CNOOC Uganda Limited (CUL) and the Government of Uganda have discovered crude oil in the Lake Albert area and want to develop and build an oil pipeline to connect
production from the Kingfisher area to Buliisa-Nwoya area of crude oil is exported to the international market.
The East African Crude Oil Pipeline (EACOP) project is part of the Lake Albert Development Project, a 1,443-kilometer transnational long-distance pipeline development project that can transport crude oil from Uganda to Tanga Port on the east coast of Tanzania .
The EACOP system is divided into three components, above ground installations (AGIs), pipelines and offshore storage terminals (MST).The above ground installation (AGI) consists of 6 pumping stations (PS-1 to PS-6) and 2
pressure reducing stations (PRS-1 and PRS-2) along the pipeline route.
The pipeline consists of 1,443 kilometers of 24-inch continuous heated export pipelines, connecting the Kabaale hub pumping station (PS-1) in the Hoima region of Uganda and the Tanga region storage reservoir in Tanzania . The
pipeline includes all intermediate valve chambers , electric heat tracing (EHT) systems, high voltage distribution (HV) and fiber optic (FO) cables and related equipment, as well as the EHT substation.
READ FULL DETAILS THROUGH THE LINKS BELOW:
[ad_2]